Sunday, July 24, 2022

Catenary / Electrical Power / Telephone Systems Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating catenary, electrical and telephone transmission information. The index page is 7.0 Catenary/Electrical Power/Telephone. The following topics have been identified and sorted. Information will be updated as I get it all together.

7.1 Cantenary Systems Overview
7.1.1 Single Poles and Fixtures
7.1.2 Double Poles and Fixtures
7.1.3 Cantenary Bridges
7.1.4 Cantenary on Bridges

7.2  Electical Power Transmission Overview

7.2.1 Power Station
7.2.2 Substation Equipment
7.2.3 Transformer Yard
7.2.4 Transformers
7.2.5 Power Poles
 
7.3 Telephone and Telegraph Overview

7.3.1 Telephone Poles

 

Sunday, July 10, 2022

Electrical and Train Control Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating electrical and DCC information. The index page is 6.0 Electrical and Train Control

The following topics have been identified and sorted. Information will be updated as I get it all together.

6.1 Train Control  
6.1.1 Analog Control
6.1.2 Digital Command Control
 
6.2 Electrical
6.2.1 Electrical Standards
6.2.2 Bus Lines
6.2.3 Track Feeders
6.2.4 Module Wiring Sequence
 
6.3 Digital Command Control
6.3.1 Command Station
6.3.2 Power Station (Booster)
6.3.3 Command Bus
6.3.4 Throttles
6.3.5 Decoders
6.3.6 Sound Systems
6.3.7 CVs

6.4 Turnout Control
6.4.1 Tortoise
6.4.2 Tam Valley
6.4.3 Manual Control
 
6.5 Signal Systems
6.5.1 Train Order Signals
6.5.2 ABS Signals
6.5.3 CTC Signals
 
6.6 Miscellaneous Lighting
6.1 Power Supplies
6.2 Light Bulbs
6.3 LEDs

Sunday, June 19, 2022

Scenery Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating Scenery information. The index page is 5.0 Scenery . The following topics have been identified and sorted. Information will be updated as I get it all together.

 General

5.1.1 Montesano (Chehelis River) Overview
5.1.2 Northern Division Overview
5.1.3 Southern Division Overview

5.2 Scenic Tools and Supplies

5.2.1 Tools
5.2.2 Supplies

5.3 General Order of Scenic Development

5.3.1 

5.4 Scenery Technique Backdrops

5.4.1 Backdrop   
5.4.2 Clouds

5.5 Scenery Technique Landforms

5.5.1 Mountains
5.5.2 Rock Faces
5.5.3 Hills
5.5.4 Cuts and Fills
5.5.5 Flat Ground

5.6 Scenery Technique Ground Cover

5.6.1 Dirt
5.6.2 Grass
5.6.3 Weeds

5.7 Scenery Technique Vegetation

5.7.1 Shrubs
5.7.2 Conifer Trees
5.7.3 Deciduous Trees

5.8 Scenery Technique Waterways

5.8.1 Rivers
5.8.2 Streams
5.8.3 Creeks
5.8.4 Bogs, Swamps and Stagnant Ponds
5.8.5 Ditches and Runoff

5.9 Scenery Technique Roadways

5.9.1 Dirt Roads
5.9.2 Gravel Roads
5.9.3 Asphalt Roads
5.9.4 Concrete Roads
5.9.5 

5.10 Vignettes
5.10.1 Tie Renewal Gang
5.10.2 Rail Renewal Gang
5.10.3 Bridge Gang
5.10.4 Painting Gang
5.10.5

Sunday, June 5, 2022

Right of Way Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating Right of Way information. The index page is 4.0 Right of Way The following topics have been identified and sorted. Information will be updated as I get it all together.

4.1. Railroad Engineering

4.1.0 Right of Way 4.1.7 Special works
4.1.1 Roadway 4.2.8 Culverts
4.1.1.1 Roadbed 4.2.9 Bridges, Piers and Abutments
4.1.1.2 Embankments
4.1.10 Tunnels
4.1.1.3 Cuts and Fills 4.1.11  Fences
4.1.1.4 Drainage 4.1.12  Grade Crossings (Road)
4.1.2  Ballast 4.1.13  Retaining Walls
4.1.3  Ties 4.1.14  Car Stops / Bumper Posts
4.1.4  Rail 4.1.15  Turntables
4.1.5  Guardrails 4.1.16 Wyes
4.1.6  Turnouts 4.1.17  Ash/Maint Pits

4.2. Putting down Trackwork

4.2.1 Putting down layout lines 4.2.8 Tunnels
4.2.2 Laying Cork 4.2.9 Turnout Control
4.2.3 Straight Track 4.2.10 Vertical Curves
4.2.4 Curves 4.2.11 Track Details
4.2.5 Turnouts 4.2.12 Painting Track
4.2.6 Crossings and Crossovers 4.2.13 Ballasting Track
4.2.7 Installing Under Track Items

4.3 Construction Diagrams

Module Station Description Length of Siding Connection
1
Brady Jct
Interchange 10 cars NP
2
Montesano WWSL Headquarters    
3
Demaine Yard Class 3 Yard 18 cars  
 
1st Division      
8
Schafer Prairie
Siding Out of Service  
9
Camp 1 Interchange 6 cars OPLC
10
Headquarters      
11
Sawmill Siding
6 cars
12
Tunnel 1      
13
Polson Canyon      
14
Satsop River      
15
Basalt  Siding 8 cars  
16
Coal Grove Class 3 Yard 16 cars
17
Reload Interchange 5 cars
OPLC
   2nd Division      
4 Smith Canal       
5
Preachers Slough
Interchange
10 cars MILW/UP
6
North River      
7
Wickwood Interchange 15 cars STC

 

 

 

 

Sunday, May 22, 2022

Construction Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating Construction information. The index page is 3.0 Construction. The following topics have been identified and sorted. Information will be updated as I get it all together.

3.1 Construction Concepts
3.2 Layout Room Amenities
3.3 Benchwork




3.4 WWSL Stud Wall
3.5 WWSL L-Girder Framing
3.6 Backdrop
3.7 Valence / Fascia
3.8 Lights
3.9 Section / Module Design
3.10 Helix
3.11 Transfer Table
3.12 Car Card Holders
3.13 Pen / Uncoupler Holders
3.14 Car Drawers
3.15 Under Deck Skirting


Benchwork Specifics
3.3.1 Open grid benchwork
3.3.2 L-Girder benchwork
3.3.3 Shelf benchwork
3.3.4 Multi-deck benchwork






   


Track Suppport Specifics
3.3.5 Flat top
3.3.6 Panel   
3.3.7 Cookie cutter
3.3.8 Spline
 




 

Sunday, May 8, 2022

Operations Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating Operations information. The index page is 2.0 Operations Section. The following topics have been identified and sorted. Information will be updated as I get it all together.

2.1 Operational Activities

Personnel
2.1.1a Dispatcher
2.1.1b Yardmaster
2.1.1c Cond/Eng
2.1.1d StationAgt

Yardmaster
2.1.4 Industrial switching

Conductor Engineer
2.1.8 Engine Servicing
2.1.11 Way Freights
2.1.12 Mixed Train
2.1.13 Interchange
2.1.14 Maint of Way
2.1.15 Helper Operations
2.3.39 Flagging
Station Agent
2.1.17 Bad Order
2.1.18 Waybills
2.1.30 Less than Carload (LCL)
2.1.31 Company Supply
2.1.32 COTS
2.3.38 Special Order
2.3.39 HazMat Placard

2.2 Operational Publications

2.2.1 UCOOR
2.2.2 Train Dispatchers Instructions
2.2.3 Timetable and Special Instructions
2.2.4 Radio Rules
2.2.5 Train Handling Instructions
2.2.6 Car Movement Instructions
2.2.7 Yard Operations Instructions
2.2.8 Interchange Instructions

2.2.9. Equipment Register
2.2.10 Equipment Register OPLC
2.2.11 Equipment Register WWSL
2.2.12 Equipment Register CLC
2.2.13 Equipment Register NWPX 
2.2.14 Equipment Register Class 1
2.2.15 Equipment Register Private Owner 2.2.16 Official Guide
  

2.3 Operational Forms

Administration

2.3.4 WWSL Pass
2.3.7 Train List
2.3.8 Switch List
2.3.9 Wheel Report

Dispatch Cards

2.3.19 Form 19

Equipment Cards

2.3.32 Car Card
2.3.33 Caboose Card
2.3.39 Special Instruction Placard (HazMat)

 

Sunday, April 17, 2022

History Section

On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.

This month I have focused on formatting and consolidating Corporate History information. The index page is 1.0 Corporate History, News Nuggets. The following topics have been identified and sorted. Information will be updated as I get it all together.

Corporate History

Other

Railroads

Companies
Grays Harbor, Wash Northern Pacific Railway Oly Peninsula Logging Company
US Army Spruce Div Milwaukee Road Railroad Basalt Sand and Gravel Co

Union Pacific Railroad O.K.Coal Company

Olympic Peninsula Logging Co O. McDonald Coal Co

Western Washington Short Line Planck Lumber Co

Schafer Bro Logging Company Buyher Propane Co

Clemmons Logging Company Cascade Pole Co

Saginaw Timber Company Y. Knott Lumber Co


American Pulp and Paper