4.0 Right of Way

4.1. Railroad Engineering

4.1.0 Right of Way 4.1.7 Special works
4.1.1 Roadway 4.1.8 Ditches, Drains and Culverts
4.1.1.1 Roadbed 4.1.9 Bridges, Piers and Abutments
4.1.1.2 Embankments
4.1.10 Tunnels
4.1.1.3 Cuts and Fills 4.1.11 Fences
4.1.1.4 Drainage 4.1.12 Grade Crossing (Road)
4.1.2  Ballast 4.1.13 Retaining Walls
4.1.3  Ties 4.1.14 Derails
4.1.4  Rail 4.1.15 Turntables
4.1.5  Guard rails 4.1.16 Wyes
4.1.6  Turnouts 4.1.17 Ash/Maintenance Pits

4.2. Putting down Trackwork

4.2.1 Putting down layout lines
4.2.2 Laying Cork 4.2.9 Turnout Control
4.2.3 Laying Straight Track 4.2.10 Vertical Curves
4.2.4 Laying Curve Track 4.2.11 Roadway Modeling Techniques
4.2.5 Laying Turnouts 4.2.12 Track Details
4.2.6 Laying Crossings and Crossovers 4.2.13 Painting Ties
4.2.7 Installing Under Track Items 4.2.14 Painting Rails
4.2.8 Tunnels 4.2.15 Ballasting Track

4.3 Construction Diagrams

Section Station Description Length of Siding Connection
1
Brady Jct
Interchange 10 cars NP
2
Montesano WWSL Headquarters    
3
Demaine Yard Class 3 Yard 18 cars  
 
 Division 1      
8
Schafer Prairie
MOW Siding 6 cars  
9
Camp 1
4 cars OPLC
10
Headquarters Interchange 8 cars  
11
Sawmill Siding
6 cars
12
Tunnel 1      
13
Polson Canyon      
14
Satsop River      
15
Basalt  Siding 8 cars  

 16

Coal Grove Class 3 Yard 16 cars
17
Reload Interchange 5 cars
OPLC
   Division 2      
4 Smith Canal      
5
Preachers Slough
Interchange
10 cars MILW/UP
6
North River      
7
Wickwood Interchange 15 cars STC


4.4 Right of Way Signage

4.4.1 Property signage
4.4.2 Location signage
4.4.3 MOW signage
4.4.4 Transportation signage
4.4.5 Safety signage

4.5 Track Maintenance

4.5.1 Track cleaning 
4.5.2

Reference

Railway Engineering and Maintenance Cyclopedia 
[1] Design standards for good operaiong trackage russel crump LDsig 12/90

No comments:

Post a Comment