Sunday, November 29, 2020

Station 6 - North River

Location.

The North River is approximately 5 miles south of the MILW/UP main line. 

Vignette. 

Operations. Approaching the North River from the east (actual compass heading is south) the single track WWSL mainline rises along a short fill to cross over the river on a 350 ft long bridge made up of one thru plate girder section on the east side of the river, one steel through truss bridge over the river, and another thru plate girder section on the west side of the river. The west end of the bridge leads to the top of a bluff overlooking the west shore.

Track Diagram
 
(Track Chart)

Roadway.

1 - Stone Abutment
1 - 90 foot Thru Plate Girder Bridge
1 - Stone Pier
1 - 125 foot Thru Truss Girder Bridge
1 - Stone Pier
1 - 90 foot Thru Plate Girder Bridge
1 - Stone Abutment

Catenary/Signaling. None

Scenery

Wide deep river.

References.

 

No comments:

Post a Comment