As discussed previously, 16 of my right of way sections were recycled from my previous layout WWSL ver. 2.0. I had to construct  12 new right of way sections. Those sections were:

Division 1

  • Schafer Prairie (Helix)
  • Camp 1 Section (2)
  • Headquarters Section  (1)
  • Sawmill Section (2)
  • Tunnel 1 Section (1)
  • Polson Canyon Section (2)
  • Satsop River Section (1)
  • Basalt Section (2)
  • Coal Grove Section (1)
  • Reload Section (1)

Division Point 

  • Brady Section  less the traversing tables (transfer table) (2)
  • Montesano Section  (1)
  • Demaine Yard Section (2)

Division 2

  • Chehelis River Section (1)
  • Preachers Slough Section (2) 
  • North River Section (1)
  • Wickwood Section (4)
All sections have been upgraded to WWSL ver.3.0 (See Section / Module Design ).

 

 

 

 

 

 