Sunday, March 14, 2021

Section Construction is Completed !

As discussed previously, 16 of my right of way sections were recycled from my previous layout WWSL ver. 2.0. I had to construct  12 new right of way sections. Those sections were:

Division 1

  • Camp 1 Section (2)
  • Headquarters Section  (1)
  • Tunnel 1 Section (1)
  • Satsop River Section (1)
  • Reload Section (1)

Division Point 

  • Brady Section  less the traversing tables (transfer table) (2)
  • Montesano Section  (1)

Division 2

  • Chehelis River (1)
  • North River Section (1)
  • Wickwood Section (1)
All sections have been upgraded to WWSL ver.3.0 (See Section / Module Design ).

 

 

 

 

 

 