Wednesday, April 22, 2020

Room Preparation 4


 Room preparation continues in Zone 2 and 4.

I finished hanging drywall, spackled and pained the last bit of ceiling in Zone 2. I used luan paneling cut to size to form utility access panels along the water lines.





The next step was to add 1/2 inch styrofoam insulation and HVAC tape to insulate the furnace ducts that were located below the ceiling lines.




Upon completion of the insulation installation, the ductwork was painted black to hid it from normal viewing.