Wednesday, May 20, 2020

Benchwork 7

The valence along the center peninsula was built and installed. The party light string was continued from valence level in Zone 2 around the end of the peninsula and down to the end wall.

The upper benchwork frame was constructed and installed. The light string was continued from zone 2 around the end of the peninsula and down to the end wall.



I then built the peninsula end valence. An interesting measure twice, cut once exercise that I'll discuss next week in greater detail.


The lower benchwork frame was constructed and installed. I then moved the 4 modules from storage onto the benchwork.




The good news is that this construction frenzy completes the rebuilding of the existing version 2 layout footprint and completes STG #1:  I wanted the first half of the layout room constructed, utilizing the existing WWSL 2.0 bench work installed within 3 to 6 months.



No comments: