The valence along the center peninsula was built and installed. The party light string was continued from valence level in Zone 2 around the end of the peninsula and down to the end wall.
The upper benchwork frame was constructed and installed. The light string was continued from zone 2 around the end of the peninsula and down to the end wall.
I then built the peninsula end valence. An interesting measure twice, cut once exercise that I'll discuss next week in greater detail.
The good news is that this construction frenzy completes the rebuilding of the existing version 2 layout footprint and completes STG #1: I wanted the first half of the layout room constructed, utilizing the existing WWSL 2.0 bench work installed within 3 to 6 months.