The compression stud wall was installed.
The Lower Rear L-girders was constructed, installed and leveled. The backdrops were installed. You will notice that I recycled a WWSL ver 2a backdrop on the right side, the sky colors are reversed because i kept the luan paneling manufactured ends mated and the cut end was placed in the corner. The Upper Rear L-Girders were installed.
Construction is halted until i get the ceiling drywalled.
No comments:
Post a Comment