In the last blog (Section 17 - Reload - Part 1) I identified the layout design elements of the Reload Section and laid out the roadway lines.
In this blog I am identifying the scenery construction concept and laying out the landforms.
As a refresher, here are the scenic elements:
2. A close tree line.
4. A close tree line.
5. A two track logging reload.
8. A wye track with engine service spur on the inside.
Scenery Design Considerations
Background
The backdrop available for the Reload section is 22 inches in height. There are two backdrop section: the main section and the terminating section 24 inches wide. Both sections will have:
- A blue sky with cumulus clouds suggesting a sunny day. See 5.4.1 Sky and 5.4.2 Clouds for construction information.
- A Close Treeline. See 5.4.9 Conifer Trees for construction information.
Landforms
Mid groundThere will be stream between the yard lead and the OPLC trackage.
4. There will be a sparse tree line and shrubbery leading into a sloping and somewhat undulating foreground. There will be indications of of previous logging activities. site construction and operational improvement activities
Foreground
8. The wye trackage and service area will be flat ground. Depending on space available a truck servicing area may be included. See 5.5.1 Flat Ground for construction details.Waterways
There will be stream between the yard lead and the OPLC trackage. See 5.8.2 Streams for construction details.
No comments:
Post a Comment