On the right hand side of the blog I have created a section called Reference Pages. Each aspect of model railroading has a 'section' that consolidates general and WWSL specific model railroading information.
This month I have focused on formatting and consolidating Right of Way information. The index page is 4.0 Right of Way The following topics have been identified and sorted. Information will be updated as I get it all together.
4.1. Railroad Engineering
4.1.0 Right of Way | 4.1.7 Special works |
4.1.1 Roadway | 4.2.8 Culverts |
4.1.1.1 Roadbed | 4.2.9 Bridges, Piers and Abutments |
4.1.1.2 Embankments |
4.1.10 Tunnels |
4.1.1.3 Cuts and Fills | 4.1.11 Fences |
4.1.1.4 Drainage | 4.1.12 Grade Crossings (Road) |
4.1.2 Ballast | 4.1.13 Retaining Walls |
4.1.3 Ties | 4.1.14 Car Stops / Bumper Posts |
4.1.4 Rail | 4.1.15 Turntables |
4.1.5 Guardrails | 4.1.16 Wyes |
4.1.6 Turnouts | 4.1.17 Ash/Maint Pits |
4.2. Putting down Trackwork
4.2.1 Putting down layout lines | 4.2.8 Tunnels |
4.2.2 Laying Cork | 4.2.9 Turnout Control |
4.2.3 Straight Track | 4.2.10 Vertical Curves |
4.2.4 Curves | 4.2.11 Track Details |
4.2.5 Turnouts | 4.2.12 Painting Track |
4.2.6 Crossings and Crossovers | 4.2.13 Ballasting Track |
4.2.7 Installing Under Track Items | |
Module | Station | Description | Length of Siding | Connection |
1 |
Brady Jct |
Interchange | 10 cars | NP |
2 |
Montesano | WWSL Headquarters | ||
3 |
Demaine Yard | Class 3 Yard | 18 cars |
|
Subdivision 1 |
8 |
Schafer Prairie |
Siding | Out of Service | |
9 |
Camp 1 | Interchange | 6 cars | OPLC |
10 |
Headquarters | |||
11 |
Sawmill | Siding |
6 cars | |
12 |
Tunnel 1 | |||
13 |
Polson Canyon | |||
14 |
Satsop River | |||
15 |
Basalt | Siding | 8 cars | |
16 |
Coal Grove | Class 3 Yard | 16 cars | |
17 |
Reload | Interchange | 5 cars |
OPLC |
Subdivision 2 |
4 | Chehelis River | |||
5 |
Preachers Slough |
Interchange |
10 cars | MILW/UP |
6 |
North River | |||
7 |
Wickwood | Interchange | 15 cars | STC |
No comments:
Post a Comment