This last work session was focused on finishing up bits and pieces of valence and ceiling projects.
- Drywall panels that i had delayed putting up were installed in zone 1.
- Spackling was done in zone 1, 2 and 3 finishing up ceiling work that had been done in bits and pieces.
- The valence extending over the helix was built and installed.
- Party light string was installed on the upper valence.
- The upper outer l-girder was installed.
Next week I have to build the helix benchwork so i can finish the upper and lower deck benchwork and call overall benchwork construction done !