Office of the General Manager
100 Railroad Avenue
Monetesano, Washington
CIRCULAR NUMBER: 8.12 DATE: January 1, 1955
BY AUTHORITY OF:
S.B.Clinard
President and General Manager ___________________________________________________________________________________
Snow accumulation on the main line was a concern, however the main concern and the most effert of railroads was interlocking and yards. Frozen switches stopped all traffic.
Pre-storm
Snow fences and sheds
Pots and Switch Heaters
Light accumulation
broms shovels
Snow patrols
Weed Burners and Snow Blowers
Heavy accumulation
Snowplows and Flangers
gondola with plow
Jordan Spreaders
Tunnel Icicle cars
half caboose with boxes - shovels brooms pickaroons etc
Snow Plan
Operations
Snow patrol
Equipment
half caboose with boxes - shovels brooms pickaroons etc
gondola with plow
Flanger
Jordan Spreader
Tunnel Icicle cars
Reference
Buchan, Alan. Snow and Ice Removal. Model Railroading, December 1995.
No comments:
Post a Comment