The WWSL
The non-NMRA links are my completed projects to meet these requirements.
1. Rolling Stock (Motive Power & Cars).Display six (6) units of rolling stock
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
2. Model Railroad Setting (Structures & Scenery).
- Construct a minimum of eight (8) square feet of layout.
- Construct five (5) structures (scratchbuilt, craftsman, or detailed and commercial kits).
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
|
3. Engineering (Civil & Electrical)
- Three (3) types of trackage are required (turnout, crossing, etc.).
- All installed trackage must be properly wired so that two trains can be operated simultaneously
- Provide one additional electrical feature such as powered turnouts, signaling, turnout indication, lighted buildings, etc.
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
Pic 1 |
No comments:
Post a Comment